
Power Tap Installation
Altitude 3550 Access Point Deployment Guide
22
To install an AP3550 Power Tap:
1
Remove and retain the 10 screws used to secure the Power Tap cover.
2
Remove the weather sealing cover to expose the unit’s interior. Do not remove or tamper with the
sealing gasket remaining on the back housing.
3
Remove and retain the 2 terminal screws releasing the 2 solder-less ring terminals.
4
Remove and retain the nut with a captive locking washer. This nut releases a solder-less ring
terminal.
Содержание Altitude 3550
Страница 4: ...Table of Contents Altitude 3550 Access Point Deployment Guide 4...
Страница 6: ...About This Guide Altitude 3550 Access Point Deployment Guide 6...
Страница 8: ...Introduction Altitude 3550 Access Point Deployment Guide 8...
Страница 16: ...Mounting Kit Assembly and Use Altitude 3550 Access Point Deployment Guide 16...
Страница 32: ......