
Altitude 3550 Access Point Deployment Guide
23
5
Loosen the gland nut on the power entry fitting.
6
Expose 6 inches of wire from the jacket. Only use wire suited for your specific installation
requirements and application.
Use 3 conductor wire of a gage suitable for the required wire run.
7
Feed the wire through the power fitting. Do not tighten the fitting at this time.
8
Using the solder-less ring terminals, strip and terminate the individual wires.
Expose only sufficient copper (using a solder-less terminal crimping tool) to ensure a good electrical
connection. No exposed copper strands should be visible outside the terminal insulator.
Содержание Altitude 3550
Страница 4: ...Table of Contents Altitude 3550 Access Point Deployment Guide 4...
Страница 6: ...About This Guide Altitude 3550 Access Point Deployment Guide 6...
Страница 8: ...Introduction Altitude 3550 Access Point Deployment Guide 8...
Страница 16: ...Mounting Kit Assembly and Use Altitude 3550 Access Point Deployment Guide 16...
Страница 32: ......