26.
Locate a 2mm ball link from the hardware bag. Measure 3” back from the leading
edge of the rudder and drill a hole to accept the shank on the ball link. Scuff the
shaft of the ball link and glue it in the hole as shown in the picture below.
27.
Next install the rudder hinges using the same procedure as with the Ailerons and
Elevators.
22