FALO’ 1XLP
N
L
M
O
Step 8
Lean the tiles (L and M) on the dome of the stove tightening
them to the hooking squares with the supplied screws. Then,
lean the 2 tiles (N and O) and the black painted cover on the
upper part.
Step 9
Finally place the front majolica (P) element using the 3 black
plates and 4 tightening screws.
P
ENGLISH