Chapter 3 – Unpacking & Installation
User Manual
16
Vortex
®
Precedence
Rev 3.6
1.
Refer to the diagram in Figure 3-1 for
the lower tool bolt pattern.
2.
Place the lower tool on the lower tooling
plate.
3.
Line up the dowel holes and insert
dowels where necessary.
4.
Bolt the lower tool to the plate using M8
x 1.25mm SHCS.
5.
Find a surface on the lower tool or on a
part loaded in the lower tool and repeat
the tool plate centering procedure on
this surface to verify that the lower tool
is centered with respect to the spindle.
If it is not centered, repeat the tool
plate centering procedure with the new
reference point. Note: plastic parts have
irregularities. More indicator movement
can be expected when using the actual
part as an indicator surface.
Upper Tool Mounting
1.
Refer to the diagram in Figure 3-2 for
the upper tool bolt pattern.
2.
Place the upper tool on the spindle
using the dowel for location.
3.
Bolt the upper tool to the spindle using
M6 x 1mm SHCS. Note: If the spindle
moves while tightening the bolts, pull up
the E-Stop to allow the motor to hold
the spindle in position. Remove your
wrench before pulling up the E-Stop in
case the motor performs its homing
sequence.
WARNING
Remove all hand tools from the
machine before pulling up the E-
stop in case the motor moves
inadvertently.
Figure 3-2 Upper Tool Bolt Pattern (Spindle)
Содержание VORTEX PRECEDENCE G1
Страница 2: ...extolinc com User Manual ii Vortex Precedence Rev 3 6 This page intentionally left almost blank ...
Страница 14: ...Chapter 1 Introduction User Manual 8 Vortex Precedence Rev 3 6 This page intentionally left almost blank ...
Страница 18: ...Chapter 2 Safety User Manual 12 Vortex Precedence Rev 3 6 This page intentionally left almost blank ...
Страница 50: ...Chapter 4 Display Screens User Manual 44 Vortex Precedence Rev 3 6 This page intentionally left almost blank ...
Страница 62: ...Chapter 5 Recipe Setup User Manual 56 Vortex Precedence Rev 3 6 This page intentionally left almost blank ...
Страница 66: ...Chapter 6 Operation User Manual 60 Vortex Precedence Rev 3 6 Sequence of Operations Flowchart ...
Страница 67: ...Chapter 6 Operation User Manual 61 Vortex Precedence Rev 3 6 Sequence of Operations Flowchart continued ...
Страница 68: ...Chapter 6 Operation User Manual 62 Vortex Precedence Rev 3 6 Sequence of Operations Flowchart continued ...
Страница 69: ...Chapter 6 Operation User Manual 63 Vortex Precedence Rev 3 6 ...
Страница 88: ...Chapter 8 Troubleshooting User Manual 82 Vortex Precedence Rev 3 6 Servo Drive Alarms ...
Страница 89: ...Chapter 8 Troubleshooting User Manual 83 Vortex Precedence Rev 3 6 ...
Страница 90: ...Chapter 8 Troubleshooting User Manual 84 Vortex Precedence Rev 3 6 ...
Страница 91: ...Chapter 8 Troubleshooting User Manual 85 Vortex Precedence Rev 3 6 Servo Drive Warnings ...
Страница 98: ...Chapter 9 Care Maintenance User Manual 92 Vortex Precedence Rev 3 6 This page intentionally left almost blank ...
Страница 104: ...651 Case Karsten Drive Zeeland MI 49464 1 800 324 6205 www extolinc com ...