Getting Started with Your Integrated Qualification System
Integrated Qualification System
23
Installing Your Controller and Expansion Units in a Rackmount
To prepare your unit for rackmount use:
1.
Ensure that your unit is turned off.
2.
Remove the bumpers of your controller unit by unscrewing the top and
bottom screws.
C
AUTION
You should remove all your modules before installing your unit into
a rackmount. Otherwise, they could be damaged or their calibration
could be affected.
Содержание IQS-600 Series
Страница 1: ...User Guide Integrated Qualification System IQS 600...
Страница 22: ......
Страница 28: ......
Страница 106: ......
Страница 132: ......
Страница 194: ...Using IQS Products in an Automated Test Environment 186 IQS 600 Standard Status Data Structure...
Страница 252: ......
Страница 274: ......
Страница 336: ......
Страница 366: ...Using the IQS 9600 Utility Module 358 IQS 600...
Страница 367: ...Using the IQS 9600 Utility Module Integrated Qualification System 359...
Страница 368: ......