
Getting Started with Your High Performance Power Meter
High Performance Power Meter
11
Inserting and Removing Test Modules
4.
Insert the protruding edges of the module into the grooves of the unit’s
module slot.
5.
Push the module all the way to the back of the slot, until the retaining
screw makes contact with the unit casing.
6.
While applying slight pressure to the module, turn the retaining screw
knob (located at the bottom of the panel) clockwise until the knob is
horizontal.
This will secure the module into its “seated” position.
Retaining screw
Retaining screw knob
Protruding edges
(right side of module)
5
6
Содержание IQS-1700
Страница 1: ...User Guide High Performance Power Meter and Optical Head for IQS 600 IQS 1700...
Страница 5: ...Contents High Performance Power Meter v Index 189...
Страница 8: ......
Страница 14: ......
Страница 16: ......
Страница 44: ......
Страница 64: ......
Страница 80: ...Performing Acquisitions 72 IQS 1700 Consulting Acquired Data To view your acquisition data select the Data tab...
Страница 96: ......
Страница 114: ......
Страница 196: ......