![EWM Taurus Synergic drive 200C Скачать руководство пользователя страница 25](http://html1.mh-extra.com/html/ewm/taurus-synergic-drive-200c/taurus-synergic-drive-200c_operating-instructions-manual_2448255025.webp)
Design and function
Intermediate hose package connection
099-005211-EW501
23.08.2010
25
5.3.2
Taurus Synergic drive 200C
6
7
8
4
3
2
5
1
Figure 5-2
Item Symbol Description
0
1
Power source
2
Intermediate tube package
3
Connecting nipple G¼, shielding gas connection
4
Stirrup
Intermediate tube package strain relief
5
19-pole connection socket (analogue)
For connecting analogue remote controls
6
Rapid-action closure coupling, red (coolant return)
7
Connector plug, welding current "+"
Welding current connection on wire feed unit
8
Rapid-action closure coupling, blue (coolant supply)
• Fasten hose package end with the strain relief.
• Push the welding current cable socket onto the “welding current connecting plug” and lock by turning
to the right.
• Connect crown nut of the shielding gas line to the G¼“ connecting nipple.
• Insert cable plug on the control lead into the 19-pole connection socket and secure with crown nut (the
plug can only be inserted into the connection socket in one position).
Where applicable:
• Lock connecting nipples of the cooling water tubes into the corresponding rapid-action closure
couplings:
Return line red to rapid-action closure coupling, red (coolant return) and
supply line blue to rapid-action closure coupling, blue (coolant supply).
NOTE
A pilot static tube for a gas flow of 0-16 l/min is fitted on each wire feed unit as standard.
For applications where a higher gas flow rate is required (e.g. for aluminium), a pilot
static tube of 0-25 l/min (see accessories) should be installed.