Step 6:
-
Rise the charger using a forklift and place it over the 5 threaded rods which come out of the
ground. Lower it slowly.
Step 7:
-
Tight the M12 nuts provided, the maximum torque has to be between 40 and 50 Nm.
Step 8:
-
Route the electrical cables, and then install again the front grommet cover (bezel).
Step 9:
-
Assemble again the rear plate and the front bumper.
Notes:
-
Never disassemble electrical terminals connected in advance (factory) to facilitate cable feeding.
-
Check charger levelling, it should be perfectly levelled.
3.3.4
Charger foundations WITH Auxiliary power cabinet (APC):
If the charger to be installed is equipped with the auxiliary power cabinet, the steps for making the
base are the same as in the previous point, 3.3.1.1, but the passage of the electrical conduit must be
done behind the charger, as shown below:
3.3.5
Preparing and installing the charger WITH Auxiliary power cabinet (APC):
To be movable and easily installed, some mechanical parts can be removed prior to installation:
>720 mm
>
41
0
m
m
230 mm
12
5
m
m
Arrivée
réseau EDF
Béton
Sol
30 mm Mini
tout autour
Incoming
power line
Concrete
Sand
Содержание Troniq
Страница 1: ...D000782AA6 EVBox Troniq Installation Manual ...
Страница 27: ...Page 27 34 8 APPENDIX 3 DIMENSIONS Charger dimensions without Auxiliary power cabinet APC ...
Страница 28: ...Page 28 34 Charger dimensions with Auxiliary power cabinet APC ...
Страница 29: ...Page 29 34 9 APPENDIX 4 CONNECTION TERMINALS DETAILS POWER AND COMMUNICATION ...