
Page 13/34
Step 4:
-
Bring the charger near to its final location in accordance with the transport safety notes
"Transportation" (See chapter 2)
Step 5:
-
Remove the M12 nuts from the upper metal sheet and Install the charger over the 5 threaded
rods which come out of the ground, it must pass through the 5 holes of the chassis, green
arrows as shown bellow:
Chassis fastening holes to the ground
Содержание Troniq
Страница 1: ...D000782AA6 EVBox Troniq Installation Manual ...
Страница 27: ...Page 27 34 8 APPENDIX 3 DIMENSIONS Charger dimensions without Auxiliary power cabinet APC ...
Страница 28: ...Page 28 34 Charger dimensions with Auxiliary power cabinet APC ...
Страница 29: ...Page 29 34 9 APPENDIX 4 CONNECTION TERMINALS DETAILS POWER AND COMMUNICATION ...