
Page 10/34
Notes:
1.
Leave the upper sheet metal 0,5 cm over the concrete (outside), to leave the bottom nuts
accessible.
2.
Before setting the charger the upper sheet metal has to be levelled.
3.
The lower sheet metal must be inside the concrete at least 4 cm.
Step 3:
-
Set up and install electric cables as stated in annex 2. Please allocate sufficient cable length to
include an excess of minimum 1000 mm over the ground level for proper connection to the
equipment.
* If the charger is to be used independently, it is not necessary to use two electrical conduits.
Step 4:
Ground
Sand
Concrete
Sand
Concrete
Incoming
power line
Power line to
Satellite units
*
ç
*
ç
Front side
Содержание Troniq
Страница 1: ...D000782AA6 EVBox Troniq Installation Manual ...
Страница 27: ...Page 27 34 8 APPENDIX 3 DIMENSIONS Charger dimensions without Auxiliary power cabinet APC ...
Страница 28: ...Page 28 34 Charger dimensions with Auxiliary power cabinet APC ...
Страница 29: ...Page 29 34 9 APPENDIX 4 CONNECTION TERMINALS DETAILS POWER AND COMMUNICATION ...