24
5.8 Check physical installation
WARNING: Make sure that it is safe to supply power. All wiring connections must be
completed and the the cover must be on the charging station and secured.
1
Supply power to the installation.
2
Use a digital multimeter to determine which phase powers the different loads in the electrical
system. Please note that the colour code inside the fuse box and/or the phase numbering may
be incorrect.
Note:
0 volt is measured when both loads are on the same phase.
Содержание Smart Charging
Страница 1: ...1 EVBox Smart Charging Smart Charging Installation manual ...
Страница 2: ...2 I m home Let s get started ...
Страница 45: ...45 I m all set Let s charge ...
Страница 46: ...46 EVB_SC_IM_V1 5_0102019 EVBox Manufacturing B V ...