www.evaelektromekanik.com
13
Üst Kapak Sacı
5.1-MAIN BUSBAR COMPARTMENT
1. Check whether the connections of the cubicles’ main
busbar are connected along with the disconnector or
the load break switch or not and tighten the loose bolts
and nuts if required. While checking the connectivity, be
careful from damaging the bushings of the disconnector
or the break switch. Never step or walk on the busbar
and the disconnector or the load breaker switch.
To find the main busbar, remove the bolted connections
of the covers found on the upper part of the cubicles.
5 - MAINTENANCE INSTRUCTIONS AND RECOMMENDATIONS FOR
THE AIR INSULATED METAL ENCLOSED CUBICLES MMMH TYPE
5.2 LIST OF TOOLS REQUIRED DURING MAINTENANCE AND INSTALLATION
Tools
Dimensions
Quantity
Dirt Chemical Solution
-
-
Clean Cloth
-
-
Open End Wrench
10’’, 13’’, 15’, 17’’, 19’’, 24’’
2 Pcs
Torque Wrench
-
1 Pcs
Socket Wrench
-
1 Pcs
Socket
10’’, 13’’, 15’, 17’’, 19’’, 24’’
1 Pcs
The manufacturer company guarantees the product against any material and operational defects for a period of
2 years within the conditions specified in the contract. In this 2-years period, if any malfunction is detected within
the conditions specified in the contract, the manufacturer company may seek repair and / or replacement of the
faulty products. Improper storage, use or repair of the equipment by the user other than the conditions specified
in this user manual, constitutes a breach of the warranty and causes it to be null.
6 - GUARANTEE TERMS
IMPORTANT WARNING:
Before starting the maintenance work; the Cubicles and the Main Busbar must
be DE-ENERGIZED and the GROUNDING must be taken too.
Содержание eva-36-CR
Страница 16: ...NOTES...
Страница 17: ...Switching The Future...