Instruction Manual ZHK
26/129
V07-19.0
Figure 19:
Guiding of load carrying equipment (mon-
obloc)
Figure 20:
Uniform load of the form tubes
Figure 21:
Securing against slipping off of the load carrying equipment
Lifting with monobloc crane lifting lugs
-
In the counter frame are drilling holes for mounting monobloc crane lifting lugs with bolt con-
nections. The bolts are mounted already by EUROCLIMA, if this option is agreed. (
-
The crane lugs are included in the scope of delivery of EUROCLIMA, if the lifting of the mon-
obloc by monobloc crane lugs is agreed.
-
In accordance with the length and the weight of the monobloc AHU 2, 3 or more crane lifting
lugs have be mounted at each side of the AHU.
-
The weight must be applied evenly over all monobloc crane lugs.
-
Dismount the crane lugs after pre-positioning of the AHU.