4) Installation of the side walls with the aid of a screwdriver, keep elevated the piece and insert in the back
the angular, pay attention that the bottom corner of the angular fits perfectly with the bottom corner of
the front side (see figure below), remove the screwdriver, consequently the side wall will lower and will be
bound with the angular, perform the same procedure on the opposite side.
5) Installation of flame trap.
6) Installation of the ash collection drawer.
7) Installation of the brazier.
Seasonal Cleaning (1400 hours)
Caution:
Cleaning that should be done with the stove completely cold by an authorized technician.
Tools required:
1-
Screwdriver
2-
Ash vacuum cleaner
3-
Allen key set
First, simply pull out the side panel of the stove as shown in
the figure on the side.
Содержание Monviso
Страница 1: ...Use and maintenance manual for pellet stove...
Страница 47: ...Below there is an example of installation of ducted stove in a home...
Страница 48: ...17 Notes...
Страница 49: ...Notes...