![Euresys EureCard Grablink Series Скачать руководство пользователя страница 57](http://html1.mh-extra.com/html/euresys/eurecard-grablink-series/eurecard-grablink-series_manual_2436138057.webp)
GRABLINK series Installation Instructions
57
Hardware installation procedure for Grablink Value cPCI
and Grablink Expert 2 cPCI
Grablink Value cPCI and Grablink Expert 2 cPCI are CompactPCI add-on boards. Before
operation, they must be physically inserted in an available CompactPCI slot of the industrial PC.
Multiple Euresys boards can be hosted in the same industrial PC, as long as slots are available.
Grablink Value cPCI and Grablink Expert 2 cPCI need no hardware setup adjustment (switch or
jumper).
Recommended installation procedure:
1. Switch-off the industrial PC and all connected peripherals (monitor, printer...).
2. Discharge any static electricity that could be accumulated on your body. You can
achieve this by touching an unpainted metal part of the enclosure of your industrial PC
with a bare hand. Make sure that the industrial PC is linked to the AC power outlet with
proper earth connection.
3. Locate an available CompactPCI slot and remove the blank front plate associated with
this location. Keep the blank front plate in a known place for possible re-use.
4. Unwrap the Grablink packing, take the board and carefully hold it. Avoid any contact of
the board with unnecessary items, including your clothes.
5. Prior to the installation of the board, disengage the insertion/extraction handles by first
unlocking the handles and pressing them down.
6. Gently insert the board in the chosen CompactPCI slot and, using the
insertion/extraction handles, ensure that it is properly seated in the backplane. The front
panel should be flush with the rack front and the insertion/extraction handles should be
locked.
7. Fasten the front panel retaining screws.
8. Establish
the
camera connection.
Recommended removal procedure:
1. Disconnect all cables that are connected to the board.
2. Loosen both of the front panel retaining screws.
3. Unlock the insertion/extraction handles.
4. Gently disengage the board from the backplane by pressing down on the
insertion/extraction handles and pull the board out of the CompactPCI slot ensuring that
the board does not make any contact with adjacent boards. If the insertion/extraction
handles do not move, it is that they are not unlock; unlock them and try again.
Содержание EureCard Grablink Series
Страница 4: ......
Страница 8: ......
Страница 10: ......
Страница 12: ......
Страница 14: ......
Страница 16: ...GRABLINK Value Description 16 Block diagram...
Страница 17: ...GRABLINK Value Description 17 Board layout...
Страница 22: ......
Страница 24: ...GRABLINK Avenue Description 24 Block diagram...
Страница 25: ...GRABLINK Avenue Description 25 Board layout...
Страница 32: ...GRABLINK Expert 2 Description 32 Block diagram...
Страница 33: ...GRABLINK Expert 2 Description 33 Board layout...
Страница 40: ...GRABLINK Value cPCI Description 40 Block diagram...
Страница 41: ...GRABLINK Value cPCI Description 41 Board layout...
Страница 46: ......
Страница 48: ...GRABLINK Expert 2 cPCI Description 48 Block diagram...
Страница 49: ...GRABLINK Expert 2 cPCI Description 49 Board layout...
Страница 62: ......