Installation
13
Install the drop chute on the trough.
Fig. 4-19: Drop chute
Attach a seal to the flange.
Fig. 4-20: Seal
Lift the discharge and carefully insert the ball joint
connection into the opening of the rotary valve.
Ensure that the ball joint connection lies
completely in the rotary valve and that it closes.
Fasten the ball joint connection on the drop chute with
the threaded rods. Only hand-tighten the nuts initially.
Repeat installation for the second discharge
Mount the troughs and conveyor screws for the second
boiler in the same way.
Checking the position of the discharge
Check the position of the gearbox in the
storeroom. The gearbox must be in the middle, so
that the spring arms do not scrape the walls later.
Mounting the spring arms
Re-attach the maintenance cover on the gearbox.
Fig. 4-21: Maintenance cover
Содержание Twin Screw Agitator
Страница 1: ...2020 09 16 EN 0000000311 V 005 X 50 0 93123 001 Twin Screw Agitator Operating Instructions ...
Страница 6: ...6 www eta co at Technical data 2 Technical data Fig 2 1 Side view Fig 2 2 Top view ...
Страница 23: ...Circuit diagram 23 8 Circuit diagram ...
Страница 26: ...www eta co at ...
Страница 27: ......
Страница 28: ...www eta co at www eta co at downloads DOWNLOAD ...