Installation
9
4
Installation
Technical illustrations
The following description depicts the installation of a
twin screw agitator with articulated arm. The illustra-
tions are representative of all versions of this
discharge. The representation of boilers has been
omitted.
Assembly and installation only by qualified
specialist personnel
The assembly and installation may be performed
by specialist personnel with the corresponding
qualifications only.
Placing the gearbox in the storeroom
Position the gearbox in the storeroom in such a way
that there is still enough space to mount the drive shaft
in the direction of the wall opening. Remove the
maintenance cover on the top of the gearbox.
Fig. 4-1: Maintenance cover
Loosen the flanges for the trough on both sides so that
they can move freely.
Fig. 4-2: Flanges for trough
Mounting the drive shaft
The drive shaft is located in the guide pipe from
factory. Affix seals to the flanges.
Fig. 4-3: Seals
Grease the drive stub of the conveyor screw with
Stauffer grease.
Fig. 4-4: Drive stub
The grease protects the connection from
moisture and thus prevents rust. Therefore the
connection can easily be detached later for necessary
repair, for example.
Содержание Twin Screw Agitator
Страница 1: ...2020 09 16 EN 0000000311 V 005 X 50 0 93123 001 Twin Screw Agitator Operating Instructions ...
Страница 6: ...6 www eta co at Technical data 2 Technical data Fig 2 1 Side view Fig 2 2 Top view ...
Страница 23: ...Circuit diagram 23 8 Circuit diagram ...
Страница 26: ...www eta co at ...
Страница 27: ......
Страница 28: ...www eta co at www eta co at downloads DOWNLOAD ...