32
www.eta.co.at
5000 h / 3 years
Cleaning and maintenance
Re-install the fill level sensor
Re-attach the mounting panel and fill level sensor to
the pellet hopper. Make sure the installation position is
correct.
Fig. 2-68: Mounting the panel for the fill level sensor
Re-install hopper panel
Re-install the side panels on the boiler.
Fig. 2-69: Panel
Re-install the panel on the top of the pellet bin.
Fig. 2-70: Panel
Fig. 2-71: Panel
Содержание PE-K
Страница 1: ...2017 01 09 EN 0000000310 V 002 X 38 0 3204 93218 001 PE K Pellet Boiler 105 140 kW Service manual...
Страница 5: ...Cleaning and maintenance Maintenance notes 5...
Страница 35: ...Cleaning and maintenance 5000 h 3 years 35...
Страница 64: ...www eta co at www eta co at downloads DOWNLOAD...