Cleaning and maintenance
Regularly
11
Open the fasteners on the lid and empty the ash box.
Fig. 2-3: Check ash
If there are large pieces of slag in the ash, the
combustion chamber and the tilting grate must be
checked and the de-ashing interval reduced, if
necessary.
Inspect the integrity of the seal on the ash box lid, and
replace it if necessary.
Fig. 2-4: Seal
Inspect the integrity of the ash box seals on the boiler,
replace them if necessary.
Fig. 2-5: Seal
Attaching the ash box to the boiler
Reattach the cover of the ash box and secure with the
fasteners. Then re-open the covers.
Fig. 2-6: Covers
Push the ash box over the connection on the boiler and
attach it to the boiler with the fasteners.
Содержание PE-K
Страница 1: ...2017 01 09 EN 0000000310 V 002 X 38 0 3204 93218 001 PE K Pellet Boiler 105 140 kW Service manual...
Страница 5: ...Cleaning and maintenance Maintenance notes 5...
Страница 35: ...Cleaning and maintenance 5000 h 3 years 35...
Страница 64: ...www eta co at www eta co at downloads DOWNLOAD...