62
www.eta.co.at
Maintenance (expert)
Records
3.21
Maintenance (expert)
This maintenance is to be carried out every 3 years or after 5000 hours.
Tasks
Notes
Empty the ash box
•
Remove excess ash from secondary combustion chamber
•
Empty the ash box
•
Check the seals
Check the pressure of the heating system
_________ bar
Check safety devices
•
Visual check of the safety valves
•
Visual check of the thermal relief valve
Chimney
•
Clean the flue tube
•
Flush the chimney's condensate drain
Clean combustion chamber
•
Clean inside of the secondary combustion chamber
•
Clean tilting grate
•
Clean secondary air openings
•
Clean ignition tubes
•
Check firebed button and firebed switch
•
Check refractory lining
Clean heat exchanger
•
Clean heat exchanger and downdraft channel
•
Clean lambda probe
•
Check heat exchanger tubes
•
Check heat exchanger cleaner
•
Clean the housing of the frequency converter
•
Inspect seals on heat exchanger covers
Clean flue gas recirculator
•
Clean flue gas recirculation piping
•
Inspecting seals on maintenance covers
Clean the draught fan
Clean the temperature sensor
Check air valve for primary and secondary air
Lubricate the grate drive
Check the ash box position switch
Check de-ashing system
Check boiler doors
Check the stoker unit
•
Check the stoker drive chains
Clean ignition
Содержание PE-K
Страница 1: ...2017 01 09 EN 0000000310 V 002 X 38 0 3204 93218 001 PE K Pellet Boiler 105 140 kW Service manual...
Страница 5: ...Cleaning and maintenance Maintenance notes 5...
Страница 35: ...Cleaning and maintenance 5000 h 3 years 35...
Страница 64: ...www eta co at www eta co at downloads DOWNLOAD...