16
www.eta.co.at
2500 h / annually
Cleaning and maintenance
Clean ignition tubes
Check the ignition tube for combustion residues and
clean it by vacuuming.
Fig. 2-16: Ignition tubes
Remove the cover on the front
Remove the screws for securing the cover. Push the
cover on the front up slightly, detach and remove it.
Fig. 2-17: Cover
Check firebed button and firebed switch
Check the mobility of the firebed button in the
combustion chamber by repeated lifting.
Fig. 2-18: Firebed button
The firebed switch on the front of the boiler must be
actuated when lifting.
Fig. 2-19: Firebed switch
Mount cover on the front
Mount the cover on the front of the boiler. Also re-install
the screws for securing the cover.
Fig. 2-20: Cover
Содержание PE-K
Страница 1: ...2017 01 09 EN 0000000310 V 002 X 38 0 3204 93218 001 PE K Pellet Boiler 105 140 kW Service manual...
Страница 5: ...Cleaning and maintenance Maintenance notes 5...
Страница 35: ...Cleaning and maintenance 5000 h 3 years 35...
Страница 64: ...www eta co at www eta co at downloads DOWNLOAD...