![eta Hack 200 kW Скачать руководство пользователя страница 16](http://html1.mh-extra.com/html/eta/hack-200-kw/hack-200-kw_service-manual_2430170016.webp)
16
www.eta.co.at
Cleaning (customer)
Cleaning and maintenance
Clean ignition tubes
Check the ignition tube for combustion residues and
clean it by vacuuming.
Fig. 2-17: Ignition tubes
Remove the cover on the front
Remove the screws for securing the cover. Push the
cover on the front up slightly, detach and remove it.
Fig. 2-18: Cover
Check firebed button and firebed switch
Check the mobility of the firebed button in the
combustion chamber by repeated lifting.
Fig. 2-19: Firebed button
The firebed switch on the front of the boiler must be
actuated when lifting.
Fig. 2-20: Firebed switch
Содержание Hack 200 kW
Страница 1: ...2018 05 16 EN 0000000299 V 005 3 43 0 3308 93710 001 Wood chip boiler 200 kW Service manual...
Страница 37: ...Cleaning and maintenance Maintenance expert 37...
Страница 66: ...www eta co at...
Страница 67: ......
Страница 68: ...www eta co at www eta co at downloads DOWNLOAD...