![eta Hack 200 kW Скачать руководство пользователя страница 11](http://html1.mh-extra.com/html/eta/hack-200-kw/hack-200-kw_service-manual_2430170011.webp)
Cleaning and maintenance
Regular maintenance
11
Open the fasteners on the lids and empty the ash bins.
Fig. 2-3: Check ash
If there are large pieces of slag in the ash, the
combustion chamber and the tilting grate must be
checked and the de-ashing interval reduced, if
necessary.
Inspect the seal in the ash bin lids to ensure it is in
good order, and replace if necessary.
Fig. 2-4: Seal
Inspect the ash bin seals on the boiler to ensure they
are in good order, replace them if necessary.
Fig. 2-5: Seal
Attach the ash bins to the boiler
Reattach the cover to the ash bins and secure with the
fasteners. Then re-open the covers in the lids.
Fig. 2-6: Covers
Push the ash bins over the connections on the boiler
and attach to the boiler with the lever.
Fig. 2-7: Attach the ash bins to the boiler with the lever
Содержание Hack 200 kW
Страница 1: ...2018 05 16 EN 0000000299 V 005 3 43 0 3308 93710 001 Wood chip boiler 200 kW Service manual...
Страница 37: ...Cleaning and maintenance Maintenance expert 37...
Страница 66: ...www eta co at...
Страница 67: ......
Страница 68: ...www eta co at www eta co at downloads DOWNLOAD...