![eta ePE-K 140 Скачать руководство пользователя страница 50](http://html.mh-extra.com/html/eta/epe-k-140/epe-k-140_installation-manual_2430165050.webp)
50
www.eta.co.at
Bottom insulation
Installation
The cables may not run along the stoker duct
since this warms up during operation.
Fig. 9-40: Stoker duct
Install the sensor for the stoker screw and set a
clearance of 2 - 3 mm. Plug the stoker screw and the
dosing screw into the plug connections (marked in
colour) on the cable harness.
Fig. 9-41: Cable guide
Connect boiler to potential equalisation
The boiler must be connected to the potential equaliza-
tion of the boiler room or the building. Country-specific
regulations must be observed.
The runners of the boiler features holes to
connect the potential equalisation (minimum
cross-section 6 mm²).
Fig. 9-42: Connect potential equalisation
9.9
Bottom insulation
Pushing in floor insulation
Connect both troughs with M5 x 6 screws. The screws
are located in the ash box. Then lay the insulation in
the floor pan.
Fig. 9-43: Floor pan
Содержание ePE-K 140
Страница 1: ...2020 07 21 EN 0000000451 V 008 5303 00 939074 003 Pellet boiler ePE K 140 170 kW Installation ...
Страница 55: ...Installation Network connection 55 ...
Страница 61: ...Electrical connections Overview of circuit boards 61 ...
Страница 65: ...Electrical connections Circuit board HA C5 65 ...
Страница 82: ...www eta co at ...
Страница 83: ......
Страница 84: ...www eta co at www eta co at downloads DOWNLOAD ...