
B
A
C
D
E
F
G
SER
VICE
34
They are then installed on both outer sides of the infill and are fixed in place by two screws as below.
F3 Log Fuelbed Installation
Logs must be located correctly as stated/depicted in this section.
The final layout should replicate the picture shown in Step 3. Place the ember flakes in a single layer
evenly after the logs have been located correctly (excess flakes should NOT be added if one even layer
has been achieved). The flakes must not cover the pilot or pilot guard.
Note: Improper positioning of any fuelbed media may create carbon build-up and will alter the unit’s
performance. Malfunctions due to improper fuel media placement will not be covered under warranty.
Log Index
Use the index above as a guide for selecting the correct logs.
Log Setup KS1150 Peninsula 400
Step 1:
KS1150 Single 850
1
1
2
2
3
2
4
2
5
2
6
0
7
2
Содержание KS1150 Peninsula 400
Страница 52: ...B A C D E F G SERVICE 52 S13 Wiring Diagram...