
21
SECTION 3
OPERATION
3.0 OPERATION
To ensure that the HandyPlasma 380 operates correctly please
perform the following steps:
1. Turn on main power switch and make sure air is flowing to the machine.
Adjust the air regulator to 65 psi before cutting operations begin.
NOTE:
This pressure adjustment must be made within 15 seconds after the machine
is turned on. If this is not done within the allotted time the main power must
be turned off and back on again to activate the 15 second preflow sequence
for air pressure adjustment.
2. Set output current from 15 to 30 amperes to suit cutting conditions prior
to operation of the machine. See Page 25.
Содержание HandyPlasma 380
Страница 4: ...4 TABLE OF CONTENTS...
Страница 14: ...14 SECTION 1 DESCRIPTION...
Страница 26: ...26 SECTION 3 OPERATION...
Страница 30: ...30 SECTION 4 MAINTENANCE WORK LEAD CONNECTION TORCH CONNECTION...
Страница 41: ...41 Notes...
Страница 42: ...Notes...