E
N
G
L
IS
H
10
INSTALLATION MEASURES
To carry out a proper installation of the operator parts as
well as to ensure the best automation performance, the
measurement levels shown picture.
m
PLEASE NOTE: ensure there are no obstacles
near the motor that might interfere with the arm,
both during movement and with the gate open.
m
PLEASE NOTE: Your gate shall be equipped with
central A and side B stops, which are fundamental
for the good system operation.