
55
ULTRA-E-F
Installation Steps for V and W Transducer Mounting Methods
When using V or W method to install S-transducers, install the two transducers on the same
side of pipeline.
A, Fix transducer in bracket
There are two holes on S-transducers each side, use four combination screws to fix transducer
and bracket.
Notes:
1.
Keep transducer end face and bracket end face at the same plane.
2.
In the package, the stainless steel screws and combination screws are already installed on
the brackets.
B, Install guide rod
Use two screws to fix guide rod.
When fixing guide rod, we should pay attention to transducer mounting spacing. The spacing
between two transducers should be the same as the value shown in Menu 25.
In practical application, in order to keep signal quality Q (Menu 90) more than 60, and make