EPSON Stylus Photo 925
Revision A
Disassembly and Assembly
Disassembly
89
T
Once the Print Head has been removed from the CR Unit, make
certain at reinstallation that the Head Grounding Plate has been
installed in the specified position on the CR Unit.
(See Figure 4-19. “Installing the Print Head”)
T
Once the CR Unit has been removed or when it is to be replaced
with a new one, make sure that the timing belt is set in the setting
groove as shown below.
Figure 4-27. Timing Belt Setting Position
Setting Groove
Timing belt
T
When installing the PG Lever on the Main Frame, set the
Torsion Spring in the position as shown below properly.
Figure 4-28. Torsion Spring Setting Position
T
When installing the CR Scale on the CR Unit, make sure that the
CR Scale does not come in contact with any of the four walls of
the square hole for sensor in the CR Unit.
Figure 4-29. CR Scale Setting Position
Torsion Spring
PG Lever
Square hole for sensor
CR Scale
Содержание Stylus Photo 925
Страница 1: ...EPSON STYLUSPHOTO925 Color Inkjet Printer SEOT02006 SERVICE MANUAL ...
Страница 5: ...Revision Status Revision Date of Issue Description A June 21 2002 First release ...
Страница 11: ...C H A P T E R PRODUCTDESCRIPTION ...
Страница 27: ...C H A P T E R OPERATINGPRINCIPLES ...
Страница 50: ...C H A P T E R TROUBLESHOOTING ...
Страница 73: ...C H A P T E R DISASSEMBLYANDASSEMBLY ...
Страница 118: ...C H A P T E R ADJUSTMENT ...
Страница 137: ...C H A P T E R MAINTENANCE ...
Страница 146: ...C H A P T E R APPENDIX ...
Страница 164: ......
Страница 165: ......
Страница 166: ......
Страница 167: ......