2. Installation Requirements
Part 1: Setup & Operation
6
2.3 Base Table
A base table for anchoring the manipulator is not supplied. Users must make or obtain
such a table independently. The size and shape of the base table differs depending on the
robot’s application. For your reference, when designing or obtaining a base table, we have
listed some manipulator requirements.
If the controller will be mounted inside the table, please refer to the controller manual or
user’s guide, which describes space requirements and environmental conditions.
Area limited by
mechanical stop
for
Joint #3
Standard range of the manipulator
ES45** ES55** ES65** EL65** EL85**
A
(arm #1 length)
B
(arm #2 length)
C
D
(motion range of the Joint #1)
E
(motion range of the Joint #2)
F
G
(
range to the stop of
J
oint #1
)
H
(
range to the stop of
J
oint #2
)
215 mm
235 mm
156 mm
125 °
140 °
136 mm
130 °
145 °
315 mm
235 mm
203 mm
125 °
140 °
182 mm
130 °
145 °
415 mm
235 mm
280 mm
125 °
140 °
260 mm
130 °
145 °
300 mm
350 mm
228 mm
130 °
140 °
201 mm
132 °
145 °
500 mm
350 mm
324 mm
130 °
140 °
292 mm
132 °
145 °
I
(range to the safeguard )
approx. 100 mm *
* In this case the safeguard completely prevents a person from touching the robot, such as a
transparent acrylic cover, for example. Refer to the
Safety
chapter in the “User’s Guide”
or “SRC5**/SPEL 95 Introduction manual” or “User’s manual” for the actual dimension
of “I”.
Figure 2. Manipulator installation dimensions [unit: mm]
Содержание EL Series
Страница 1: ...ES EL series Rev 9 EM019R893F SCARA ROBOT MANIPULATOR MANUAL ...
Страница 2: ...MANIPULATOR MANUAL ES EL series Rev 9 ...
Страница 12: ...x ...
Страница 14: ...2 ...
Страница 16: ...1 Manipulator Part Names Part 1 Setup Operation 4 ...
Страница 30: ...4 User Wires and Pneumatic Tubes Part 1 Setup Operation 18 ...
Страница 42: ...5 End Effectors Part 1 Setup Operation 30 ...
Страница 44: ...6 Attaching a Camera Valve and Other Devices Part 1 Setup Operation 32 ...
Страница 68: ...8 Motion Range and Robot Coordinates Part 1 Setup Operation 56 ...
Страница 70: ...9 Emergency Stop Part 1 Setup Operation 58 ...
Страница 80: ...11 Clean Model Part 1 Setup Operation 68 ...
Страница 92: ...80 ...
Страница 94: ...Maintenance Safety Precautions Part 2 Maintenance 82 ...
Страница 104: ...2 Opening the Covers Part 2 Maintenance 92 ...
Страница 112: ...3 Replacing the Cable Unit Part 2 Maintenance 100 ...
Страница 138: ...5 Replacing the Motors Part 2 Maintenance 126 ...
Страница 162: ...6 Replacing the Reduction Gear Units Part 2 Maintenance 150 ...
Страница 186: ...9 Replacing the Ball Screw Spline Unit Part 2 Maintenance 174 ...
Страница 210: ...11 Calibration Part 2 Maintenance 198 ...
Страница 214: ...12 Clean Model Maintenance Part 2 Maintenance 202 ...
Страница 224: ...13 Protected Model Maintenance Part 2 Maintenance 212 13 6 Wiring Schematic 2 ...
Страница 236: ...14 Maintenance Part Lists Part 2 Maintenance 224 ...