Part 2: Maintenance
3. Replacing the Cable Unit
97
Installation
(1) Pass the cables of the new cable unit through the cable bracket and nut. Fasten the
duct joint to the cable bracket.
(2) Pass the cables through the base connector plate and fasten the main cable elbow
fitting using four bolts (M6
×
12).
(3) Referring to the wiring schematics in the following pages, connect the connectors
properly.
CAUTION
Connect the signal cable securely. Do not put anything heavy on the signal cable
or bend it too much. This may damage the signal cable. If abnormality occurs in
the signal cable, the robot may malfunction.
(4) Referring to the
Wiring Schematic 1
in the next page, connect the ground wires and
pneumatic tubes properly.
(5) Mount the receptacle on the base connector plate using four bolts (M3
×
8).
(6) Bind the cables with wire ties as they were before the unit replacement. The
following must be paid attention to when binding the cables with a wire tie:
The cables must not touch the pulley, timing belt or other movable parts or areas.
Do not pinch the cables when closing the cover.
Do not allow unnecessary strain on the cables. The cables must be arranged as
such so that they will not be forcibly bent. Unnecessary strain on the cables may
cause wire disconnection inside.
The cables inside the duct must be long enough so that the cables will not be pulled.
(7) Attach the cable bracket to the arm using three bolts (M4
×
8).
(8) Fasten the duct joint using a spanner (double side 51mm wide) or a pair of pliers.
(9) Place the base connector plate back to where it was and fasten it.
(10) Reinstall the arm top cover to complete the reassembly.
Содержание EL Series
Страница 1: ...ES EL series Rev 9 EM019R893F SCARA ROBOT MANIPULATOR MANUAL ...
Страница 2: ...MANIPULATOR MANUAL ES EL series Rev 9 ...
Страница 12: ...x ...
Страница 14: ...2 ...
Страница 16: ...1 Manipulator Part Names Part 1 Setup Operation 4 ...
Страница 30: ...4 User Wires and Pneumatic Tubes Part 1 Setup Operation 18 ...
Страница 42: ...5 End Effectors Part 1 Setup Operation 30 ...
Страница 44: ...6 Attaching a Camera Valve and Other Devices Part 1 Setup Operation 32 ...
Страница 68: ...8 Motion Range and Robot Coordinates Part 1 Setup Operation 56 ...
Страница 70: ...9 Emergency Stop Part 1 Setup Operation 58 ...
Страница 80: ...11 Clean Model Part 1 Setup Operation 68 ...
Страница 92: ...80 ...
Страница 94: ...Maintenance Safety Precautions Part 2 Maintenance 82 ...
Страница 104: ...2 Opening the Covers Part 2 Maintenance 92 ...
Страница 112: ...3 Replacing the Cable Unit Part 2 Maintenance 100 ...
Страница 138: ...5 Replacing the Motors Part 2 Maintenance 126 ...
Страница 162: ...6 Replacing the Reduction Gear Units Part 2 Maintenance 150 ...
Страница 186: ...9 Replacing the Ball Screw Spline Unit Part 2 Maintenance 174 ...
Страница 210: ...11 Calibration Part 2 Maintenance 198 ...
Страница 214: ...12 Clean Model Maintenance Part 2 Maintenance 202 ...
Страница 224: ...13 Protected Model Maintenance Part 2 Maintenance 212 13 6 Wiring Schematic 2 ...
Страница 236: ...14 Maintenance Part Lists Part 2 Maintenance 224 ...