BEIJING EPSOLAR TECHNOLOGY CO.,LTD.
5
3. Installation and wiring
3.1 Install the controller
1) Determine the Installation Location and Heat-dissipation Space
Determination of installation location: The controller shall be installed in a place with
sufficient air flow through the radiators of the controller and a minimum clearance of
150 mm from the upper and lower edges to ensure natural thermal convection.
2) Determine the size of Installation Location (158*96mm)
3) Cut out the section (158*96mm)
4) Mark holes and drill holes
φ 3.5mm*4
Содержание GM3024N
Страница 1: ...GoMate Series Flush Mount Solar Charger User Manual Model GM3024N...
Страница 2: ......
Страница 18: ...BEIJING EPSOLAR TECHNOLOGY CO LTD 15 9 Dimensions Any changes without prior notice V1 1...
Страница 19: ......