System Cable Connections
Please note the following points before making
the connections.
•
Ensure to power off the circuit which
you are working on to avoid any short.
•
Drip-loops should precede the entry
point as shown in below diagram. This will
avoid any water to seep into the ACU.
•
The ACU has to be connected to 230V
AC 50Hz from a online type UPS, otherwise the
warranty on EPAK system will be void.
•
After the ODU and IDU are installed, proceed to
connect the ACU and ODU as follows:
•
The two antenna cables (RX+power and TX) must be connected to the ACU and the ODU.
•
The modem cables (RX, TX and WAN) must be connected to the ACU.
•
The ACU must be connected to 230V/50Hz AC from our recommended UPS.
•
Vessel network or switch can be connected to Lan1 /Lan2 of ACU.
•
The modem must be powered by the ACU with provided power cable.
•
The user can also connect the ship's gyro information (optional) via the NMEA connector at the back-
panel of the ACU.
4.10 Wiring VSAT Ku-Band Systems
Doc ID 0304 03.07.20
Page 15/32
Figure 4.10 Cable connection with drip loop
Figure 4.11: Wiring scheme VSAT Ku-Band Systems
Содержание DSi13Ku Pro
Страница 29: ...Drilling Pattern DSi6 Doc ID 0304 03 07 20 Page 29 32 Figure 8 1 Drilling Pattern 60cm VSAT...
Страница 30: ...Drilling Pattern DSi9 Doc ID 0304 03 07 20 Page 30 32 Figure 8 2 Drilling Pattern 90cm VSAT...
Страница 31: ...Drilling Pattern DSi13 Doc ID 0304 03 07 20 Page 31 32 Figure 8 3 Drilling Pattern 130cm VSAT...