The following points need to be considered during installation of the IDU

All   IDU   components   (ACU+Modem)   should   be   mounted   in   a   professional   19"   server   rack.   For   the
installation, operation and maintenance enough space should be available at the front and also some
space must be allowed behind the unit for the cables.

Proper cooling and ventilation is required for all IDUs.  The ACU should be stored within a temperature
range of -40°C to 85°C. During operation, the ambient temperature must be maintained between -20°C to
55°C.

Fresh air intake is from the front of the ACU, and warm air is dispensed out the back. Therefore, Both
front and back panel of the ACU must be kept clear to allow ventilation. Otherwise, overheating might
cause system shutdown.

Either the UPS is provided by EPAK or a compatible UPS (on-line/double-conversion type) has to be
installed by the ship owner for powering the IDU.

4.8

Power supply for VSAT system

The ACU requires 90-264V AC @47-63 Hz, 1 phase. However, as the power supplied by vessel generators
can fluctuate considerably, an online type UPS is compulsory for EPAK VSAT system otherwise the warranty
becomes   void.   The  ACU   supplies   the   ODU   with   48V   DC   power   and   the   BUC   with   either   24V   or   48V
depending on the model. There is also a switched AC outlet at the back of the ACU which can be used for the
modem’s power supply.

By default the ACU is equipped with a 2.5A fuse. This is suitable for operation with 230V. A spare 5.0A fuse is
provided alongside the ACU, which should be used instead, in the rare case that the antenna system should
be operated with 110V.

Caution:

 Grounding of the equipment is necessary to avoid potential differences between the ship’s 

ground potential and the equipment’s. The antenna’s ground connection can be connected directly to 
the ship’s ground to avoid undesired current flow.

 Doc ID 0304  03.07.20

Page 14/32

Figure 4.9: ACU top view

Содержание DSi13Ku Pro

Страница 1: ...Installation and User Manual Maritime VSAT systems DSi6Ku Pro DSi6Ku Pro DSi9Ku Pro DSi13Ku Pro Doc ID 0304 03 07 20 Page 1 32...

Страница 2: ...ry note sent to you with the system Disclaimer Any responsibility or liability for loss or damage in connection with the use of this product and the accompanying documentation is disclaimed by EPAK Th...

Страница 3: ...4 5 Installing the Antenna 13 4 6 Removing Transport Lock of the Antenna 13 4 7 Installing the Indoor Unit 16 4 8 Power supply for VSAT system 17 4 9 System Cable Connections 18 4 10 Wiring VSAT Ku Ba...

Страница 4: ...om the vessel This unit provides an easy to use web interface for configuring the antenna checking the antenna s current status and configuring your network EPAK systems can be easily configured in a...

Страница 5: ...as they can affect the antenna performance To avoid the worst interference the antenna should be mounted at a different vertical level either 15 above or 15 below the radar Kindly note the recommended...

Страница 6: ...stored at a temperature between 40 C to 85 C During operation the ambient temperature must be maintained between 20 C to 55 C Frequent imbalances in the environment can damage the IDU electronics 2 7...

Страница 7: ...eams Monitoring live status of the antenna Providing Internet access voip services to the vessel Mounting screws DSi6 DSi9 4 mounting screws DSi13 12 mounting screws VSAT manual VSAT manual for easy o...

Страница 8: ...1 Tools required for Installation Following tools are required for installation electric drill screwdriver 4 mm and 8 5 9 mm drills Hexagon socket screw key size 6 size 13 screw wrench 4 2 Select Ante...

Страница 9: ...crowave region of the electromagnetic spectrum A radar placed close to the ODU can degrade the antenna s performance Thus it is necessary to maintain the minimum distance between the two equipments Th...

Страница 10: ...oax cables double shielded EcoFlex 10 or 15 is recommended EPAK warranty does not cover decreased performance due to improper wiring The maximum recommended cable length for EcoFlex10 is 50 m and Ecof...

Страница 11: ...or full view or refer to page 30 Click for full view or refer to page 31 Doc ID 0304 03 07 20 Page 11 32 Figure 4 3 Dimensions 60 cm antenna dome front and bottom Figure 4 4 Dimensions 90 cm antenna d...

Страница 12: ...the included screws The screws have to be mounted from below and through the base plate of the antenna Connect both the coaxial cables RX and TX at the base of the antenna Close all drilled holes with...

Страница 13: ...th movement by turning the handle left as shown below 4 7 Installing the Indoor Unit Before installing the IDU find a suitable location for the equipment within cable lengths Ensure that the display o...

Страница 14: ...nstalled by the ship owner for powering the IDU 4 8 Power supply for VSAT system The ACU requires 90 264V AC 47 63 Hz 1 phase However as the power supplied by vessel generators can fluctuate considera...

Страница 15: ...d to connect the ACU and ODU as follows The two antenna cables RX power and TX must be connected to the ACU and the ODU The modem cables RX TX and WAN must be connected to the ACU The ACU must be conn...

Страница 16: ...hernet cable to the satellite modem The ACU forwards the IP traffic from the modem to its own LAN interfaces You can also connect the ship s compass to the NMEA interface of the ACU for accurate headi...

Страница 17: ...N port of your modem E LAN 2 Connector RJ45 Connect this port to your local network a network switch or a PC F Open BMIP Connector RJ45 Use this port to connect a modem which supports Open BMIP Use on...

Страница 18: ...to replace a broken fuse 1 Those connectors carry the supply for the BUC and antenna Do not connect or disconnect while the ACU is turned on Access to the Webinterface Connect a computer to this port...

Страница 19: ...inistrator or EPAK IT service In case your system has not been configured yet use the following credentials Username admin Password empty line no spaces Navigation Menu Upon successful login the user...

Страница 20: ...are not necessarily showing the current direction and position of the antenna pointing They are showing the correct direction to the satellite antenna elevation and skew calculated according to the a...

Страница 21: ...emperature and the used disk space The graphs show data over a day over the last week and over the last month 5 2 3 Status Logs You can check all daemons currently running on the ACU By default the st...

Страница 22: ...uration Modem In this section you can select the modem type the IP address type static DHCP and the IP address of the modem The system selects a default IP address for you However please change the IP...

Страница 23: ...ormally the modem is used as a default gateway The user can configure the LTE connection settings and network prioritzisation and network fallback settings in the LTE section The user can select the p...

Страница 24: ...ton on your screen then enter the satellite name the position and tilt if any To save your entry click on the check button and to undo your changes click on cancel button Note If the satellite is in t...

Страница 25: ...rrect satellite the antenna transmit path needs to be calibrated on first use This has to be done in coordination with your service provider So to continue with this process please contact us or your...

Страница 26: ...sal LNB with LOF at 9 75 10 6 GHz 6 3 Supported Modem Types EPAK s VSAT systems provides compatibility with various modems including iDirect Evolution X3 X5 X7 iDirect Velocity X7 Spacebridge Hughes H...

Страница 27: ...20 C to 55 C Storage temperature 40 C to 85 C Humidity According to IEC 60945 IP class IP 30 Compass safe distance 0 5m according to IEC 60945 Position acquisition supplied by ODU Supported modems idi...

Страница 28: ...ngths from slightly over one centimetre down to 0 75 centimetres The Ka band is part of the K band of the microwave band of the electromagnetic spectrum Ku Band The frequency range from 10 7 to 18GHz...

Страница 29: ...Drilling Pattern DSi6 Doc ID 0304 03 07 20 Page 29 32 Figure 8 1 Drilling Pattern 60cm VSAT...

Страница 30: ...Drilling Pattern DSi9 Doc ID 0304 03 07 20 Page 30 32 Figure 8 2 Drilling Pattern 90cm VSAT...

Страница 31: ...Drilling Pattern DSi13 Doc ID 0304 03 07 20 Page 31 32 Figure 8 3 Drilling Pattern 130cm VSAT...

Страница 32: ...ons 130 cm antenna dome front and bottom 11 Figure 4 6 Position of transport locks 12 Figure 4 7 Transportation lock open closed 13 Figure 4 8 ACU Front view 13 Figure 4 9 ACU top view 14 Figure 4 10...

Отзывы: