7
GB
Assembly
Power element
The power switchgear may only be installed
outside the cabin. It is advisable to select the
outside wall of the cabin or the cabin ceiling for
the installation. If ductwork is provided for the
electrical installations then the position of the
power switchgear is predetermined by that.
Please follow the instructions for installation:
1. Remove the cover of the power element
by pushing the retaining tang to the in-
side with a fl at screwdriver and pull the
housing top upwards in a swinging fa-
shion (Fig. 1).
The 5 mm diameter boreholes for the
supplied wood screws 4 x 20 mm are
drilled according to the dimensions
shown in Fig. 3.
2. Insert one of the wood screws into the
top center hole. The power element is
hooked onto this screw. Therefore, leave
the screw out by ca. 3 mm (Fig. 4).
3. Hook the power element to the 3 mm
protruding screw in the upper mounting
hole.
Insert the supplied rubber grommet
into the openings at the rear wall of the
housing and insert the connecting cable
through these openings.
Fig. 1
Connect the Control Line
A 2 m long control line to connect power
element and control unit are provided in the
delivery scope.
Plug for
Power unit
Control ele-
ment
This line must be inserted into the power unit
fi rst. To do that, position the red part of the
line on the same colored contact strip in the
power unit.
Contact strip
Control line in-
serted
Fig. 2
Fig. 2a
The control line is now inserted through the
right cable feed-through and run up to the
installation site of the control element.
X3
Jumper
Displa
y
X6
X4
V
W WB
P+
TEMP.-SENSOR
Nr. 2
Nr. 1
TEMP.-
LIMITER H-SENSOR
Ub E
G
Res
24h
12h
6h
Jumper
Displa
y
X6
X4
WB
P+ Nr. 2
Nr. 1
TEMP.- Ub E
G
Res
24h
12h
6h