
6
Call 1300 369 273
www.enware.com.au
8. Locate the inlet fill assembly and fit to the Inlet connection of
the tank
(SEE IMAGE 13).
The union connection will have to be disassembled to screw
the top elbow in. Use appropriate thread sealing tape, to seal
the inlet connection.
NOTE:
Inlet connection for inlet fill assembly is noted by an arrow
directed into tank.
Overflow outlet is noted by an arrow out of tank.
Assemble union connections for inlet fill assembly, then
secure the inlet fill assembly onto tank frame using brackets
supplied. The frame has pre-drilled holes to accomodate
the 2x bracket fixing screws (M6 head cap screws). Place
rubber clamps around the plastic pipe to secure the inlet fill
assembly onto bracket.
9. Reach inside bottom access of tank, and pull the activation
valve arm down. Use appropriate step ladder to do so.
Attach shower activation pull handle to the activation valve
arm using the nut and bolt supplied
(SEE IMAGE 14).
INSTALLATION IS NOW COMPLETED AND THE TANK SHOWER IS
READY TO BE COMMISSIONED.
SEE PAGE 6 FOR COMMISSIONING.
IMAGE 13
IMAGE 14