
www.enware.com.au
Call 1300 369 273
4
TANK INSTALLATION
4. Find the coil of eyewash hose supplied inside the tank.
Uncoil the hose and feed the hose through the top back
frame as shown
(SEE IMAGE 9)
, with the free end loose,
ready for connection to the tank.
Insert the other end of hose into the push-fit connector on
the eyewash, and push until it bottoms out.
IMAGE 9
IMAGE 8
MOUNTING PLATE
INSTALLING ONTO GROUND SURFACE
Secure the tank shower frame onto the ground, a relocatable
foot base or concrete footing. Use appropriate fixing bolts or
anchors through the Mounting Plates to fix the shower frame
securely to the ground.
For installation requiring cyclone wind category rating, see
page 7.
Important: Ensure the frame is installed on a flat, level
surface.
INSTALLING ONTO GROUND WITH RELOCATABLE FOOT BASE
Place the Foot Base onto a flat, level surface.
The ground surface must be well compacted and have a
maximum slope of 1% when installed on subgrade.
All four corners of the Frame have Mounting Plates to allow
the Frame to be bolted to the Foot Base.
Attach the Bolts and Washers into the corresponding
Mounting Plates already on the Foot Base, and fix the Frame
onto Foot Base assembly. Use Anti-Seize compound on all
bolts to allow for any disassembly and relocation of the
shower unit in future.
Install ramps up to the Foot Base on all sides, to reduce the
risk of trip hazard.
IMAGE 7
installation