Installation
M
ODEL
1200 B
RICK
P
LACEMENT
& T
UBE
L
OCATIONS
:
COMPLETE THE STOVE AND SMOKE PIPE INSTALLATION BEFORE PLACING THESE BRICKS.
When replacing bricks, use only pumas type fi re bricks.
TOTAL BRICKS:
11 - Full size bricks
9” long x 4.5” wide x 1.25” thick
(22.9 cm long x 11.4 cm wide x 3.2 cm thick)
2 - Partial bricks 9” long x 3” wide x 1.25” thick
(22.9 cm long x 7.6 cm wide 3.2 cm thick)
1 - Half brick
4.5 “ long x 4.5” wide x 1.25” thick
(11.43 cm long x 11.43 cm wide x 3.175 cm thick)
Removing Air Tube:
If a secondary air tube needs to be removed, place a screwdriver (any style except
fl at head) into one of the air holes and tap it with a hammer/mallet to the left until the right end of the
tube is freed. To installation a secondary air tube reverse the above instructions.
IMPORTANT:
All secondary air tubes must be in place for proper operation.
Pa
rt
ia
l B
ric
k
Ha
lf
Br
ic
k
Fu
ll
Si
ze
Br
ic
k
Tube A
Tube E
Tube D
Figure 31: Brick Placement for 1200 shown with Secondary Air Channel
and Tubes.
1.
Place the three (3) full size
bricks along each side of the
fi rebox and one (1) full size
brick on either side of the back
of the fi rebox.
2.
To place the fl oor bricks, lay
the two (2) partial bricks along
the back of the fl oor. Then on
the left, lay two (2) full size
bricks and on the right, lay a
full size brick in the center and
the half brick in the front (for
the ash dump). The spaces
between the bricks will soon
fi ll with ashes.
30