Installation
Installation and Operation Manual – AQUATEC 1000
16
Doc.-ID: AQUA_16012020_EN
2.12
Preparation of the pneumatic Cable
Pneumatic tubing FEP-0002
Nut
Clamp ring
Support sleeve
Both, the pneumatic tubing for the reference air (blue)
and the test gas (green) have to be prepared with
support sleeves
, clamp rings
and nuts
.
Figure 14 -
Preparation of pneumatic tubes
2.13
Gas plans
Pneumatic version for Instrument air
SME-50000010
Pneumatic version with pumps
SME-50000020
Figure 15 -
Gas plans
Pressure control valve
Filter
Choke non return valve
Choke non return valve
Solenoid valve 3/2 ways
Reference air pump / Test air pump
Solenoid valve 3/2 ways
Solenoid valve 3/2 ways
Flow meter
Flow meter
Instrument air in, 4 – 10 Bar
Reference air in
Test gas in, Max. 3 Bar
Test air in
Test gas out, 150 - 180 l/h
Test gas in
Reference air out, 30 – 40 l/h
Test gas out, 150 - 180 l/h
Reference air out