![Energetiq EQ-99-FC Скачать руководство пользователя страница 22](http://html1.mh-extra.com/html/energetiq/eq-99-fc/eq-99-fc_operation-and-maintenance-manual_2409943022.webp)
16
EQ99 Operation Manual Rev. 2
Chapter 3
INSTALLATION
Unpacking
Upon arrival, start by inspecting all parts of the system for completeness and any damage
incurred in shipping. The EQ-99-FC shipping box should contain:
1) EQ-99-FC Power Supply Controller unit
1) EQ-99-FC Lamp House unit
1) Black interconnecting cable from Lamp House to Power Supply Controller (9
pin mini D-sub).
OPTIONAL
1) EQ-99-RC Remote Control Module with interlock connector
1) I/O cable with 15 pin D- connector at each end
1) 12 VDC Power Supply (universal input voltage)
EQ-99FC-115Fiber-1 115um Output Fiber, 1m long
EQ-99FC-115Fiber-2 115um Output Fiber, 2m long
EQ-99FC-230Fiber-1 230um Output Fiber, 1m long
EQ-99FC-230Fiber-2 230um Output Fiber, 2m long
EQ-99FC-450Fiber-1 450um Output Fiber, 1m long
EQ-99FC-450Fiber-2 450um Output Fiber, 2m long
Use care when unpacking to avoid damaging the armored fiber optic cable.
If any part is missing or appears damaged, contact Energetiq immediately. Do not attempt to
substitute any parts. There are no user-serviceable parts inside the EQ-99-FC Lamp House or
Power Supply Controller unit.
Connections
Installation of the EQ-99-FC consists of connecting electrical and gas supplies, and
connecting the Lamp House module to the user’s equipment.
Energetiq Ex. 2060, page 22 - IPR2015-01375