Commissioning
Source container FQG66
26
Hauser
7
Commissioning
7.1
Preparatory steps
7.1.1
Tool required for general operation
• Key for padlock
• Allen screw 6mm across flats
• Pliers for releasing the key from the wire cable
7.2
Function check
Before commissioning your measuring point, ensure that the post-installation and post-
connection checks have been performed:
• "Post-installation check" checklist
• "Post-connection check" checklist
7.3
Switching ON the measuring device
L
CAUTION
Switching ON the radiation
‣
Before switching ON the radiation, make sure that no-one is in the radiation zone (or
inside the product vessel).
‣
The radiation may only be switched ON by properly instructed staff.
7.3.1
Manual version with/without proximity switch
1 →
2 →
3 →
1
2
3
4
A0023595
A0027121
A0027123
‣
Remove padlock (1). Turn the
screws (2) (6mm across flats)
on the cover three to four
times to release them.
‣
Remove the cover (3).
‣
Remove the lock pin (4) from
the guide tube of the source
holder rod.
Содержание FQG66
Страница 41: ...Source container FQG66 Repair Endress Hauser 41 Ensure proper separation and reuse of the device components ...
Страница 42: ......
Страница 43: ......
Страница 44: ...www addresses endress com 71483609 71483609 ...