ControlCare Panel PC SPC150
4 Mechanical Installation
Hauser
9
4.1.3
Cut-out
The cut-out for installation should be selected such that it is stabilized by the bracing in the cabinet
or panel. If necessary, bracing must be installed.
• Degree of protection IP 65 is attained only for plate thickness of 2 mm (0.1") or greater.
• It must also be insured that the panel is correctly installed by skilled personnel using the screw
clamps provided and that the rubber gasket is properly seated.
• Check that there is enough clearance to remove the panel from the cut-out.
Fig. 4-2 shows the dimensions in mm (in) for the cut-out
Fig. 4-2: Dimensions in mm (in) for the cut-out
4.1.4
Fastening and sealing
Screw clamps are used to fasten the Panel PC in the cut-out. They are seated in the openings
provided for them in the housing.
• Insert the ControlCare Panel PC SPC150 into the cut-out and hold in position.
• Seat the screw clamps in the openings provided for them.
• Fasten the Panel PC in the cut-out by tightening the screws.
Fig. 4-3: Fastening and sealing
252 (9.92)
314 (12.4)
Cellular rubber gasket
Seal
Fastening
Screw clamp
screw clamp