Z2000/C2020 Tank Gauge Setup Guide – PD02/0001 Rev.01 Feb/2017
Z2000 / C2020
Tank Gauge Set-Up
To Calibrate the Gauge, Open the front cover 4 screws,
Connect the Tank
Probe, and Power the unit
.
Toggle the calibration switch, top right marked CAL (LK2)
The first screen to show is a “Cube Tank” Middle Button Scrolls through Tank Type Opti
ons
Hidden Button Scrolls through settings.
Hidden Button
Choose the Feature you require, then set the
values by using the hidden button to select the
value to change, then use the other two buttons
to Decrease (LEFT) or Increase (RIGHT)the value.
You Must Scroll to YES and use the
Hidden
button to
Confirm
YES
for all Screens
Now Use the
Right Button
to Scroll across to
Alarm
Trigger points and
SG
setting
1
2
3
7
6
4
5
You must scroll to YES and
Confirm YES with Left
hand Hidden Button to
save your values.
Left (hidden Button) selects Option
Right two buttons change value as in 5
above.