CleanFit P CPA 471
3 Installation
Hauser
13
KCl electrode
1. Pull lifting tube fully into assembly (in
»Maintenance« position, see Fig. 3.8)
2. Turn stop bolt lock through 90° so that
plastic grooves are located above
recesses.
3. Turn lifting tube clockwise until stop
bolt lock engages.
4. Remove splash protection cap.
5. Then slacken lifting tube by turning
anticlockwise. Unscrew tension
sleeve.
6. Remove electrode tube from lifting
tube.
7. Insert electrode in electrode tube (
➀
),
screw it in and tighten with socket
spanner (WAF17) by ¼ turn (
➁
).
8. Insert electrode and electrode tube in
lifting tube.
9. Insert tension sleeve from bottom in
lifting tube (
➂
) and screw to electrode
tube (
➃
).
10.Screw lifting tube and electrode hand-
tight on assembly.
11.Insert measuring cable from top
through protective tube and KCl hood.
12.Screw measuring cable on electrode
plug-in head and tighten hand-tight.
13.Push PM connector on PM connection.
14.Insert electrolyte supply tube through
KCl hood and connect to electrode
electrolyte connection.
15.Place measuring cable and electrolyte
supply tube in splash protection cap
and place this assembly on protection
tube.
16.Release stop bolt lock catch: Remove
stop bolt lock and turn through 90°.
Remove electrode in the reverse
sequence of operations.
Fig. 3.11: Installing the liquid KCl electrode in the
lifting tube
Fig. 3.12: Connection on CPS 41 electrode