CE 4
Mechanical installation
Hauser
11
3.3.2
Installation of the measurement station
"
Caution!
•
Make sure that the unit is isolated from the mains power when installing or removing
the system.
Follow the next steps when fitting the measurement station on the foundation:
1.
Using the foundation plan as a template, set the rawl bolts or rawl plugs for fixing
the station onto the foundation (
→
Chap. 3.2.3).
2.
Place the measurement station onto the hardened foundation. Please note that the
pump is fixed separately to the pallet!
3.
Screw the measurement station tightly to the foundation using the nuts and washers
(Attention: only use V2A stainless steel parts).
4.
Anchor the pump tightly to the foundation.
5.
Connect the suction pipe, outflow pipe, water sampler suction hose, condensation
water overflow, water sampler overflow and the fresh water pipe.
6.
Complete the electrical connection (see chapter 4.1)
Fig. 7:
CE4 measurement station connection schematic
Pos. A: Analysis pipework
Pos. B: Electrical compartment with swing frame
Pos. C: Water sampler electronic compartment
Pos. D: Water sampler wet compartment
Pos. E: Base/pump room
Pos. F: Water sampler suction hose
Pos. G: Water supply/fresh water supply
Pos. H: In and outflow hose