background image

BA 160R/09/en/08.03
51006364

CE 4

Measurement station

Operating instructions

Содержание CE 4

Страница 1: ...BA 160R 09 en 08 03 51006364 CE 4 Measurement station Operating instructions...

Страница 2: ...to wire and electrical connect the measurement station can be found Step 3 Operating and set up of the measurement station Chap 5 Page 13 The operation of individual components can be found in the res...

Страница 3: ...he connections 13 5 Operation 13 5 1 Communication and data security 13 6 Commissioning 15 6 1 Installation check 15 6 2 Commissioning the measurement station 15 6 3 Device set up 16 7 Maintenance and...

Страница 4: ...ith the necessary regulations and EU guidelines If the measurement station is missued or used in an inappropriate manner could be dangerous Mechanical and electrical installation commissioning and mai...

Страница 5: ...c Costs incurred for disposal due to lack of cleaning of the unit or for personal injury corrosion burns etc will be invoiced to the user It is always recommended to protect the unit correctly when re...

Страница 6: ...different Analysis system ASP Station 2000 water sampler CE 4 operating instructions ASP Station 2000 operating instructions CE 4 technical instructions Operating instructions and certificates for th...

Страница 7: ...urement station must be transported upright and secured to prevent tipping over Avoid shocks Fig 2 Transport to installation point Pos A Lifting the measurement station with a crane Fitting correct li...

Страница 8: ...the system is avoided e g small weir etc The feed hose should therefore be fixed as required Caution Dry running and sand grains particles can shorten the life span of the eccentric pump The outflow...

Страница 9: ...ft Fig 5 Foundation drawing with water sampler Pos A M8x20 rawl bolts or M8 rawl plugs Pos B In and outflow hoses for the measurement liquid Pos C Water supply Pos D Power cables Pos E Signal cables P...

Страница 10: ...so that the a good head of water is always available Suction hose is immersed by using a weight see Accessories Sampling hose installation The sampling hose must always be installed with a downward s...

Страница 11: ...ely to the pallet 3 Screw the measurement station tightly to the foundation using the nuts and washers Attention only use V2A stainless steel parts 4 Anchor the pump tightly to the foundation 5 Connec...

Страница 12: ...re this with the power supply on the legend plate 4 2 Screening and potential compansation When installing please take note of the following If screened cables are to be used then the screen on the ou...

Страница 13: ...gnals 5 1 1 Data storage For data logging Endress Hauser can offer a number of different recording and data acquisition devices e g Eco Graph or Memo Graph Fig 8 Recorders from Endress Hauser for data...

Страница 14: ...value sequences quantities operating times monitors alarm set points and stores this data both internally and on a diskette Functions of this device are the same as the Eco Graph additionally counter...

Страница 15: ...ssioning Install the in and outflow hoses as well as the water sampler suction hose see chapter 3 2 4 Remove the protective covers on the snsor only on pH sensors Sensors must be calibrated on site ta...

Страница 16: ...onnections and internal screw connections are tight Run a visual control of the electronic compartment making sure that there are no loose connections Check the sensors and if required recalibrate Tak...

Страница 17: ...ndition of the jubilee clips and hoses for reuse 6 Loosen the fixing clamps and remove the pipework system 7 Loosen the screwed fitting on the pipework These can be very tight so use a pipe clamp oil...

Страница 18: ...uction hoses Fig 9 Connection schematic for manual cleaning using clear water 7 3 2 Automatic fresh water cleaning system Cleans the analysis pipework purge the suction hose and cleans the sensors usi...

Страница 19: ...lable using numbered Block numbers e g B01 Sensor rinse interval set up position For controller set up Chap 7 3 4 Suction hose rinse Fig 11 Time cycles for automatic suction hose rinse Sensor rinse Fi...

Страница 20: ...7 3 4 The detergent feed control is carried out by the Chemo Clean CYR10 injector see CYR10 operating manual in section 7 in the ring binder The cleaning sequence can also be started manually pushbutt...

Страница 21: ...r default programme is dependent on the cleaning system ordered This means that the programme can be immediately started by using the Cleaning ON OFF switch found in the swing frame and the system wil...

Страница 22: ...d time on the display This display flashes until the date and time are set B Indication of the inputs on the display Fig 18 Indication of the inputs on the display Pos A Inputs I1 to I9 Pos B Inputs I...

Страница 23: ...up menu Fig 21 set up menu Using this menu point the programme can be stopped and then changed into the operating mode set in the main menu Follow these steps 1 Move the to Stop Keys V or W 2 Accept S...

Страница 24: ...moved to the point in the parameter that is to be changed Using the keys V or W the value can be changed 6 Accept the new set up using the OK key 7 Return to Continuous operation by operating the ESC...

Страница 25: ...be found in section 3 in the ring binder However it is recommended that the user holds the most important consumables and parts subject to wear and tear on stock In order to make the correct decission...

Страница 26: ...ipework Cumulative alarm active No medium available Motor overload switches pump off Measurement fault Water sampler fault Pipework overpressure monitor active Blockage in pipework after pump Power su...

Страница 27: ...ed electrician Pump does not run or runs only intermittently Dry run protection active Thermal overload or short circuit on the motor No medium available Call skilled electrician Feed rate of the ecce...

Страница 28: ...can be found at the end of these instructions Caution Do not return a device if it is deemed impossible to remove all hazardous materials e g material seepage in scratches or media diffused by the pla...

Страница 29: ...Conductivity sensor CLS 21 Conductivity 10 S cm to 20 mS cm Oxygen sensor COS41 Dissolved oxygen 0 05 mg l to 20 0 mg l Turbidity sensor CUS41 Turbidity 0 00 to 9999 FNU 0 00 to 9000 ppm 0 0 to 300 0...

Страница 30: ...nal inputs or outputs e g cummulative alarm water sampler Terminal strip X6 Analogue signal inputs or outputs e g 0 4 to 20 mA measured signal Pos C PG cable entries IP68 10 3 2 Supply voltage 230 V 5...

Страница 31: ...n accordance with the EMC regulations All Endress Hauser devices in the measurement station fulfil the requirements laid down in the EN 61326 10 4 2 Process Medium temperature 0 to 40 C Medium Liquid...

Страница 32: ...0 mm 1633 800 668 737 35 1901 Module Component Material Water sampler Cabinet Inner shell ditribution pan Insulation Suction hose dosing tube Hose connection dosing chamber cover Conductivity switch s...

Страница 33: ...336 EWG EMC regulations 73 237 EWG Low voltage regulations 10 7 Additional documentation Product Group Water samplers PG 005R 09 en Product Group Measurement stations PG 001R 09 en System Information...

Страница 34: ...time on display LOGO 22 Delivery 7 Dimensions 9 F Fault finding checklists 25 I Identification lists 6 Initial commissioning 15 Inputs on display LOGO 22 Installation of the measurement station 11 Ins...

Страница 35: ...health o biologically hazardous o inflammable o safe Please mark the appropriate warning hints 5HDVRQ IRU UHWXUQ BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB BBBBBBBBBB...

Страница 36: ...bia Bogota D C Colsein Ltda Tel 01 2 36 76 59 Fax 01 6 10 78 68 Costa Rica San Jose Euro Tec S A Tel 2 20 28 08 Fax 2 96 15 42 Ecuador Quito Insetec Cia Ltda Tel 02 2 26 91 48 Fax 02 2 46 18 33 El Sal...

Отзывы: