32
3.
This completes the calibration.
Off stack zero calibration
This procedure may be used if: A clear stack condition is not possible and the zero appears to be incorrect or if
the flange to flange distance on site are different than the original factory set up.
1.
Remove the transceiver and retro reflector from the hinge pins, remove the service module and install
the system on E.M.S. test stands and at the correct flange to flange distance plus 11 inches. The
additional 11 inches compensates for air plenum spacing, as the air plenums are not used for the off
stack zero calibration. If EMS test stands are not available, an alternate method is to use 3" pipe
flanges with air plenums installed, contact the factory for air plenum availability. Set the spacing
between the 3" flanges exactly the same as Flange-to-Flange measurement.
2.
Clean transceiver and retro windows.
3.
Connect the control unit with the control to service module test cable kit (p/n 1469) and apply power
to the system.
4.
The retro reflector must be level.
5.
Follow instruction for "Clear on stack zero and span calibration".
Содержание 1304
Страница 45: ...44 Section 8 DRAWINGS ...
Страница 46: ...45 EMS 1001 Mounting under 6 STACK ...
Страница 47: ...46 EMS 1002 Mounting over 6 stack ...
Страница 48: ...47 EMS 1024 Air purge Weather cover mech Installation ...
Страница 49: ...48 EMS 1078 PANEL cut out for 1304 control unit ...
Страница 50: ...49 EMS 1079 1304 control unit dimensions ...
Страница 51: ...50 EMS 1077 Terminal identification 1304 control unit ...
Страница 52: ...51 EMS 1131 1304 with recorder system wiring ...
Страница 54: ...53 EMS1101 Sht 1 of 3 Dual Blower system wiring ...
Страница 55: ...54 EMS 1101 Sht 2 of 3 Single Blower system wiring ...
Страница 56: ...55 EMS 1101 Sht 3 of 3 Without Blower system wiring ...