Installing Support Brackets
A horizontal pipe support MUST BE used for each 3 feet of horizontal
run. The pipe supports should be placed around the pipe and nailed
in place to framing members. There MUST BE a 3 inch clearance to
FRPEXVWLEOHVDERYHǫLQFKGLDPHWHUSLSHDQGHOERZVDQGLQFK
FOHDUDQFHRQERWKVLGHVDQGERWWRPRIǫLQFKSLSHWRFRPEXVWLEOHV
RQDOOKRUL]RQWDOSLSHVHFWLRQVDQGHOERZV
Vertical runs of this vent systems must be supported every 4 feet
DERYH WKH DSSOLDQFH ÀXH RXWOHW E\ ZDOO EUDFNHWV DWWDFKHG WR WKH
ǫLQFKYHQWSLSHDQGVHFXUHGZLWKQDLOVRUVFUHZVWRVWUXFWXUDO
framing members.
Figure 47
Installing Firestops
)LUHVWRSVDUHUHTXLUHGIRUVDIHW\ZKHQHYHUWKHYHQWV\VWHPSDVVHV
WKURXJKDQLQWHULRUZDOODQH[WHULRUZDOORUDFHLOLQJ7KHVH¿UHVWRSV
DFWDVD¿UHEUHDNKHDWVKLHOGDQGDVDPHDQVWRLQVXUHWKDWPLQLPXP
clearances are maintained to the vent system.
+RUL]RQWDOUXQVLQWKHYHQWV\VWHPZKLFKSDVVWKURXJKHLWKHULQWHULRU
RUH[WHULRUZDOOVUHTXLUHWKHXVHRIZDOO¿UHVWRSVRQERWKVLGHVRI
WKHZDOOWKURXJKZKLFKWKHYHQWSDVVHV
3RVLWLRQWKH¿UHVWRSVRQERWKVLGHVRIWKHLQFK[LQFKKROH
SUHYLRXVO\FXW6HFXUHZLWKQDLOVRUVFUHZV7KHKHDWVKLHOGVRIWKH
¿UHVWRSV0867%(SODFHGWRZDUGVWKHWRSRIWKHKROH&RQWLQXH
WKHYHQWUXQWKURXJKWKH¿UHVWRSV
See Figure 48.
Figure 48
9HUWLFDOUXQVRIWKLVV\VWHPZKLFKSDVVWKURXJKFHLOLQJVUHTXLUHWKH
XVHRIRQHFHLOLQJ¿UHVWRSDWWKHKROHLQHDFKFHLOLQJWKURXJKZKLFK
the vent passes.
Position a plumb bob directly over the center of the vertical vent
component and mark the ceiling to establish the center point of the
vent. Drill a hole or drive a nail through this center point and check
WKH ÀRRU DERYH IRU DQ\ REVWUXFWLRQV VXFK DV ZLULQJ RU SOXPELQJ
runs. Reposition the appliance and vent system, if necessary, to
DFFRPPRGDWHFHLOLQJMRLVWVDQGRUREVWUXFWLRQV
Cut a 10 inch x 10 inch hole through the ceiling, using the center
SRLQWSUHYLRXVO\PDUNHG)UDPHWKHKROHZLWKIUDPLQJOXPEHUWKH
VDPHVL]HDVWKHFHLOLQJMRLVWV
See Figure 49.
If the area above the
FHLOLQJLV127DQDWWLFSRVLWLRQDQGVHFXUHWKHFHLOLQJ¿UHVWRSRQ
the ceiling side of the previously cut and framed hole.
See Figure
50.
If the area above the ceiling is an attic, position and secure the
¿UHVWRSRQWRSRIWKHSUHYLRXVO\IUDPHGKROH
See Figure 51.
NOTE:
Remove insulation from the framed area in the attic before
LQVWDOOLQJWKH¿UHVWRSDQGRUYHQWSLSHV
Figure 49
Содержание DVP42FP30N-4
Страница 20: ...31455 10 1115 Page 20 Figure 29 Figure 30 Figure 31 EXAMPLES TOP VENT RUN...
Страница 41: ...31455 10 1115 Page 41 3ODFH RJ RQWR WZR SLQV RQ UHDU ORJ VXSSRUW DV VKRZQ EHORZ...
Страница 42: ...31455 10 1115 Page 42 3ODFH RJ RQWR WZR OHIW IURQW SLQV RQ EXUQHU SDQ DV VKRZQ EHORZ...
Страница 43: ...31455 10 1115 Page 43 3ODFH RJ RQWR WZR ULJKW IURQW SLQV RQ EXUQHU SDQ DV VKRZQ EHORZ...
Страница 44: ...31455 10 1115 Page 44 3ODFH RJ RQWR RQH SLQ RQ RJ DQG RQH RQ RJ DV VKRZQ EHORZ...
Страница 45: ...31455 10 1115 Page 45 5 Log assembly is completed...
Страница 48: ...31455 10 1115 Page 48 Figure 75 MILLIVOLT SYSTEM STANDING PILOT WIRING DIAGRAM...
Страница 60: ...31455 10 1115 Page 60 INTERMITTENT PILOT CONTROL SYSTEM TROUBLESHOOTING...
Страница 70: ...31455 10 1115 Page 70 PARTS VIEW...