background image

24032-2-1008

Page 28

A qualified service person recommended by your Empire dealer should 

conduct an annual inspection and maintenance of the appliance, its venting, 

and the installation to keep it running safely and efficiently. The follow-

ing procedures should be performed only by a qualified service person. 

The gas supply should be turned off whenever a maintenance procedure 

is performed.
If the glass front, relief doors, or front access door are removed for servic-

ing, they must be replaced prior to operating the appliance.

Glass Cleaning

It  will  be  necessary  to  clean  the  glass  periodically.  During  start-up 

condensation, which is normal, forms on the inside of the glass and causes 

lint, dust and other airborne particles to cling to the glass surface. Also 

initial paint curing may deposit a slight film on the glass. It is therefore 

recommended that the glass be cleaned two or three times with a non-

abrasive household cleaner and warm water (we recommend gas fireplace 

glass cleaner). We do not recommend using packaged spray type household 

glass cleaner. After that the glass should be cleaned two or three times 

during each heating season depending on the circumstances present.

General Glass Information

Only glass approved for use in Empire Comfort Systems Inc. fireplaces 

may be used for replacement. The glass replacement should be done by a 

licensed or qualified service person.

WARNING:

1.  The use of substitute glass will void all product warranties.

2.  Care must be taken to avoid breakage of the glass.

3.  Under no circumstances should this appliance be operated without 

the glass front or with a broken glass front. Replacement of the glass 

(with gasket) as supplied by the manufacturer should be done by a 

qualified service person.

4.  Do not abuse the glass by striking or hitting the glass.

WARNING: Do not use abrasive cleaners on glass. Do not attempt to 

clean glass when glass is hot.

Failure to follow these warnings could cause a serious safety issue to the 

operator, such as fire or other serious conditions.

Glass Assembly Replacement

1.  Remove casting top from casting.

2.  Remove casting front from casting.

3.  Lower valve cover on firebox.

4.  Release two door latches at bottom of firebox.

5.  Grasp  bottom of  glass  frame, lift glass  frame upward  in  order  to 

release glass frame from lip on top of firebox.

6.  Place glass frame assembly on a non-abrasive surface. The exterior 

of  the  glass  frame  assembly  should  be  facing  the  non-abrasive 

surface.

7.  Insert  a  putty  knife  between  glass  and  bottom  corners  on  frame. 

Carefully separate glass from frame.

8.  Use putty knife to remove silicone and gasket material from frame. 

Surface of frame must be clean and dry.

9.  At each corner of frame apply (2) three inch beads of high temperate 

(orange) silicone.

10.  With thin gasket on glass facing silicone on frame, insert glass into 

frame. Carefully press the glass onto frame in order to have contact 

between glass and silicone.

11.  Allow silicone to set-up for an adequate time

12.  Align and place top of glass frame over lip on top of firebox. Grasp 

bottom  of  glass  frame,  push  inward  and  place  glass  frame  onto 

firebox.

13.  Attach two door latches to bottom of firebox.

14.  Replace casting front onto casting.

15.  Replace casting top onto casting.

16.  Replacement of glass assembly is completed.

Figure 35

IMPORTANT: 

Turn off gas before servicing appliance. It is recommended 

that a competent service technician perform these check-ups at the beginning 

of each heating season.

• 

DO NOT put anything around the heater that will obstruct the 

flow of combustion and ventilation air. See clearances.

• 

DO  examine  venting  system  periodically.  Clean  and  replace 

damaged parts. Examinations should be made at the start of the 

heating  season  and  also  in  mid  heating  season  under  average 

conditions.

• 

Clean Burner and Control Compartment 

 

Keep the control compartment, logs, and burner areas surrounding 

the logs clean by vacuuming or brushing at least twice a year.

Cleaning Procedure 

1.  Let the unit cool if it has been operating.

2.  Shut off gas supply.

3.  Lower valve cover on firebox.

4.  Release two door latches at bottom of firebox.

5.  Grasp  bottom of  glass  frame, lift glass  frame upward  in  order  to 

release glass frame from lip on top of firebox.

6.  Vacuum burner compartment especially around orifice/primary air 

openings.

7.  Align and place top of glass frame over lip on top of firebox. Grasp 

bottom  of  glass  frame,  push  inward  and  place  glass  frame  onto 

firebox.

8.  Attach two door latches to bottom of firebox.

9.  Ignite pilot. (See 

Lighting Instructions

, Page 23)

10.  Operate the main burner and visually check to make sure the flame 

pattern appears similar to the pictorial illustration shown for 

Main 

Burner Flame Characteristics

, Figure 31. If it appears abnormal 

call a service person.

MAINTENANCE

SHOWN WITH TOP & FRONT REMOVED

GLASS FRAME

ASSEMBLY

LATCH GLASS FRAME

WITH 2 GLASS FRAME

CLAMPS

Содержание DVP30CA30B-N1

Страница 1: ...30CA30 B F M S W N 1 DVP30CA30 B F M S W P 1 Do not store or use gasoline or other ammable vapors and liquids in the vicinity of this or any other appliance WHAT TO DO IF YOU SMELL GAS Do not try to l...

Страница 2: ...tem Identi cation 16 Framing and Finishing 17 18 Horizontal Termination 18 Vertical Termination 19 20 Log Placement 21 Operating Guidelines 22 Lighting Instructions 23 Pilot Flame Characteristics 24 M...

Страница 3: ...ace is temperedglass Iftheglassiscrackedordamagedin any way it should be replaced only with a complete glass frame assembly from Empire See parts list on Page 30 for ordering DONOTusethis replaceifany...

Страница 4: ...heodorantinescapedgascanadsorborabsorbontoorintowalls masonry and other materials and fabrics in a room That will take some of the odorant out of the gas reducing its odor intensity LP Gas may stratif...

Страница 5: ...ply with NFPA 720 and be ANSI UL 2034 listed and IAS certi ed 3 SIGNAGE Ametalorplasticidenti cationplateshallbe permanently mounted to the exterior of the building at a minimum height of eight 8 feet...

Страница 6: ...in such work familiar with all precautions required and has complied with all the requirements of the authority having jurisdiction The installation must conform with local codes or in the absence of...

Страница 7: ...6DVA E90B DVKVP Direct Vent Kit for Vertical Run 2 46DVA 48B 46DVA DC 46DVA F6 46DVA SC 46DVA FS 46DVA VCH Accessories TMV Millivolt Wall Thermostat Reed Switch FRBC Battery Operated Remote Control FR...

Страница 8: ...This should consist of a vertical length of pipe tee connected into the gas line that is capped on the bottom in which condensation and foreign particles may collect When using copper or ex connector...

Страница 9: ...rs 45 angle to Wall 4 101 6 mm Floor 0 0 mm Installation on Rugs and Tile This appliance must be installed on a at solid continuous surface e g wood metal concrete This may be the oor or it may be rai...

Страница 10: ...te must be used above 10 feet Maximum horizontal run from appliance outlet 12 feet 3 66 m Maximum vertical rise and horizontal run is a combined total of 25 feet 7 62 m Maximum elbows 2 90 for the sec...

Страница 11: ...ide and bottom Cutting the Hole Figure 7 After the appliance has been positioned in its permanent location the hole through the exterior wall of the house can be cut This hole needs to be 10 high x 10...

Страница 12: ...2 Remove cast iron front and carefully set aside 3 Carefully remove glass door 4 Remove the log shelf by removing the 2 screws securing the log shelf to the wall 5 Loosen the upper 2 screws of both ai...

Страница 13: ...ack down locking the air shutter in place Be sure that the air shutter is the same distance from the burner ori ce on both sides of the air shutter for proper burner t up 10 Carefully replace the burn...

Страница 14: ...ng Routes and Components Important It is always best to locate the appliance in such a way that minimizes the number of offsets and horizontal vent length Figure 14 Since it is very important that the...

Страница 15: ...e of the regulator I Clearance to service regulator vent outlet 6 feet 1 83 m minimum J Clearance to non mechanical air supply inlet to building or the combustion air inlet to any other appliance 12 i...

Страница 16: ...hes The vent pipe is now locked together Continue adding components per the pre planned vent system con guration Be certain that each succeeding vent component is securely tted and locked into the pre...

Страница 17: ...usly cut Secure with nails or screws Continue the vent run through the restops See Figure 19 Figure 19 Vertical runs of this system which pass through ceilings require the use of ONE 1 ceiling restop...

Страница 18: ...provided Before attachment of the termination run a bead of silicone sealant rated above 250 F on its outside edge too so as to make a seal to that exterior wall NOTE Wood screws can and should be rep...

Страница 19: ...are as follows 1 Check areas of the venting system which are exposed to the elements for corrosion These will appear as rust spots or streaks and in extreme cases holes These components should immedi...

Страница 20: ...bustiblematerials includinginsulation to the vent system are maintained Vertical Through the Roof Applications Your Gas Fireplace has been approved for a Vertical installations up to 25 feet of vent r...

Страница 21: ...on the groove in the left front log 12 Place right twig onto right side pin on rear log with toe resting all the way to the right on the right front log 13 Align and place top of glass frame over lip...

Страница 22: ...to OFF Standing Pilot Operation 1 Follow the SAFETY and LIGHTING INSTRUCTIONS for standing pilot controls found in this manual and on labels found attached to the appliance CAUTION Duringtheinitialpur...

Страница 23: ...a pilot which must be lighted by hand When lighting the pilot follow these instructions exactly B BEFORELIGHTINGsmellallaroundtheappliancearea for gas Be sure to smell next to the oor because some ga...

Страница 24: ...mopilejustbelow the tip A slight yellow ame may occur where the pilot ame and main burner ame meet The incorrect pilot ame is not touching the thermocouple or thermopile This will cause the thermocoup...

Страница 25: ...epersonshouldcleandust lint and any light accumulation from the logs and the rebox area An extra soft brush should be used on the logs as they are extremely fragile a vacuum cleaner may be used on the...

Страница 26: ...en wires female push ons attach to the ON OFF REMOTE switch At the opposite end of the wire harness the black and green wires female push ons attach to the gas valve An additional green wire and the r...

Страница 27: ...24032 2 1008 Page 27 Wiring Diagram Figure 34 WIRING continued...

Страница 28: ...ass frame assembly on a non abrasive surface The exterior of the glass frame assembly should be facing the non abrasive surface 7 Insert a putty knife between glass and bottom corners on frame Careful...

Страница 29: ...ivolts minimum while holding thevalveknobdepressedtothepilotposition withthepilot lit and the ON OFF switch in the OFF position Replace the faulty thermopile if the reading is below the speci ed minim...

Страница 30: ...UE OUTLET GASKET 3 REQUIRED 5 24176 AIR DROP ASSEMBLY 6 R 9678 AIR DROP ASSEMBLY TRANSITION GASKET 7 24015 AIR DROP TRANSITION 8 R 9679 FIREBOX TRANSITION GASKET 9 17379 BLOW PLATE BRACKET 2 REQUIRED...

Страница 31: ...24032 2 1008 Page 31 PARTS VIEW 1 9 4 2 3 4 6 4 8 10 11 12 14 15 16 28 29 31 36 37 38 39 40 41 42 43 44 45 30 17 18 19 20 21 22 24 25 26 27 32 34 35 23 13 33 5 7 29 47 9 46...

Страница 32: ...IGHT 8 R 9694 CASTING DOOR LEFT 9 24042 FIREBOX SUPPORT BRACKET 2 REQUIRED 11 R 9549 CASTING LEG B 12 R 9548 CASTING LEG A PORCELAIN BLACK 1 R 9570 TOP INSERT RIGHT 2 R 9569 TOP INSERT LEFT 3 R 9568 C...

Страница 33: ...24032 2 1008 Page 33 1 2 8 3 4 5 6 7 9 9 10 10 10 10 12 11 11 12 CASTING PARTS VIEW...

Страница 34: ...o casting before fully tightening bolts as shown in Figure 37 9 Replace cast iron or stone inlay inserts into casting top Note Be sure to remove side shelf supports prior to removing cast iron top to...

Страница 35: ...lot 6 Route fan control wires through rectangular notch on wire channel left 7 Attach 1 4 push on terminal from blue wire on the fan control to the AUTO top tab on the switch OPTIONAL BLOWER INSTALLAT...

Страница 36: ...ly into a properly grounded three prong receptacle Do not cut or remove the grounding prong from this plug For an ungrounded receptacle an adapter which has two prongs and a wire for grounding can be...

Страница 37: ...nt Then determine the Part Number not the Index Number and the Description of each part from the following appropriate illustration and list Be sure to give all this information Stove Model Number Sto...

Страница 38: ...24032 2 1008 Page 38 SERVICE NOTES...

Страница 39: ...facing the front of the direct vent replace the minimum clearances to combustible construction material are the following Top of appliance ceiling 36 inches Heater Corners 45 angle to Wall 4 inches Re...

Страница 40: ...s Empire Comfort Systems Inc 918 Freeburg Ave Belleville IL 62220 If you have a general question about our products please e mail us at info empirecomfort com If you have a service or repair question...

Отзывы: